Good Neighbor:
“Prior to the construction we did a noise audit of the surrounding area because we are in a high density residential area. There are condominiums within 300’ of the UNOX aeration tank. The condos are in excess of 200,000$ each. We are in a high scale residential area. The plant has not affected them. We have not had complaints about either odors or noise. Now, one other thing I would like to stress is the PSA system is also housed in a building. There is no noise from the PSA at all. We bring in school groups anywhere from the high school to college level. They are quite surprised at the lack of odors from the UNOX system.:

Process Stability:

“From a schock loading point of view, we have heavy
During a recent visit to the facility for a scheduled turnaround Lotepro’s Richard Peluso interviewed the plant Superintendent Tom Meholic.Here is what Mr. Meholic had to say about topics of interest to plant operators.
Everyday Operations :

“We have shift coverage of 16 hours a day, that is roughly from eight in the morning to approximately midnight. What we end up doing on an off shift is covering with maybe 2 or 3 operators. The UNOX system is quite reliable. We have a common alarm system for the plant with beepers to call back people on an emergency basis. We are down to eleven employees now. With that we are able to cover the treatment plant and the nine pumping stations in the collection system. We have in excess of 150 miles of sewer lines in the system.”
Introduction News & Notes Spotlight Process Service D/B/O Request Information Representation Archives (N&N, SOS)

NEXT

Thomas Meholic Superintendent Wastewater Plant Oakhurst, NJ (left)Tom Meholic Glen Henry (right) Tom DiOrio